Related
Release Notes 16.080.0
These release notes provide brief descriptions of changes included in eHarvest 16.080.0.
System Updates
Estimator
DESCRIPTION | ID # |
---|---|
Quick PRF: Annual Forage was added to the Quick PRF Estimate with all 12 growing seasons. |
200042 |
The Livestock Notification Management column headers did not filter the grid accurately. Changes that were made: All column filters for the Livestock Notifications Management grid were fixed to accurately filter the grid records. |
200106 |
Forms & Reports
DESCRIPTION | ID # |
---|---|
Data Warehouse Report added a report for MPCI policies with 3 reinsurance years of zero premiums, named "3 Years Zero AR Report".
|
200069 |
User Report: User Report was not accurately producing results for the different lockout and inactivity flags for users. Changes that were made: Report logic updated to allow opt in for each type of lockout separately, and the final report lists each type separately. |
200078 |
Production Report: The Area Classification field in the Production Report was not printing the applicable information. Changes that were made: The Production Report was updated to print the Area Classification data, when applicable, for all years. |
200105 |
The policy number hyperlink on the unprocessed SYRP Report was causing an error and not redirecting to the policy. Changes that were made: The policy number hyperlink was fixed and is linked to the policy. |
201577 |
Global
DESCRIPTION | ID # |
---|---|
eSign Dashboard: A "Please Wait" message was added to the eSign Dashboard, and will display after the 'Refresh Status' is selected for an ePacket record. The message was added to prevent multiple 'Refresh Status' processes and the possibility of multiple copies attaching to the policy. |
201370 |
MPCI
DESCRIPTION | ID # |
---|---|
The detail lines of the Master Yield Manual Summary Unit were updating to a 'Complete' status, but were switched to 'Incomplete' when 'Mark Complete' of the coverage. Changes that were made: The Manual Master Yield process was updated to not recalculate Non Summary Units during the Mark Complete process, so the detail lines maintained the 'Complete' status. |
200114 |
The following issues were fixed with the Fast Edit PR Revised Signature Dates.
|
200899 |
The Online Help Site was updated with topics as well as with current release notes. |
2000096 |