Related
Release Notes 9.040.0
These release notes provide brief descriptions of changes included in eHarvest9.040.0.
System Updates
Forms & Reports
DESCRIPTION | ID # | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
LRP App: An issue was found where the LRP Application was missing page 1 when printing with a policy that had canceled coverages. With this ticket, the LRP Application has been updated to include page 1 when the form is being printed for active and canceled coverages for all report styles. This update applies for all years. |
120554 |
||||||||||||
SOI: The Schedule of Insurance (SOI) has been updated in the following ways for all years:
|
62433 |
||||||||||||
RMA added the Forage Seed (Alfalfa Seed) Underwriting Report to the 2021 DSSH. With this ticket, this form was updated to meet DSSH form requirements and base form standards as well as include some AIP requests. Some of the changes include:
|
119099 |
||||||||||||
SPOI: Forage Production (0033) with Plan AYP (04) 2021 Special Provisions in IL, MN, PA, and WI were updated and made available from RMA on July 30, 2020. These Special Provisions for 2021 have been downloaded and implemented in the System. |
119399 |
||||||||||||
Provisions: With this ticket, the 2021 WFRP Policy and Provisions have been implemented in the System. Provisions print with the MPCI Policy Declaration Page when the print option to print provisions with the form is selected. The MPCI Policy Declaration Page is available to print from the MPCI policy Print tab and from the Batch Printing menu. |
120287 |
||||||||||||
SPOI: California (CA) Citrus Trees and WFRP 2021 Special Provisions were updated and made available from RMA on August 28, 2020. These Special Provisions for 2021 have been downloaded and implemented in the System. |
120294 |
||||||||||||
Provisions: With this ticket, the 2021 Hurricane Insurance Protection (HIP) Data Provisions and Wind Index Endorsement have been implemented in the System. Provisions print with the MPCI Policy Declaration Page when the print option to print provisions with the form is selected. The MPCI Policy Declaration Page is available to print from the MPCI policy Print tab and from the Batch Printing menu. |
120306 |
||||||||||||
Provisions: With this ticket, the 2022 Florida (FL) Citrus Fruit Crop Provisions with the APH (90) Plan have been implemented in the System. Provisions print with the MPCI Policy Declaration Page when the print option to print provisions with the form is selected. The MPCI Policy Declaration Page is available to print from the MPCI policy Print tab and from the Batch Printing menu. |
120307 |
||||||||||||
Provisions: With this ticket, the 2021 California Citrus Trees Crop Provisions have been implemented in the System. Provisions print with the MPCI Policy Declaration Page when the print option to print provisions with the form is selected. The MPCI Policy Declaration Page is available to print from the MPCI policy Print tab and from the Batch Printing menu. |
120308 |
||||||||||||
Provisions: With this ticket, the 2021 Pistachio Crop Provisions have been implemented in the System. Provisions print with the MPCI Policy Declaration Page when the print option to print provisions with the form is selected. The MPCI Policy Declaration Page is available to print from the MPCI policy Print tab and from the Batch Printing menu. NOTE: RMA published updated Pistachio Crop Provisions on September 11, 2020; these will be implemented in the System in a future release with TFS #120774. |
120309 |
||||||||||||
Provisions: With this ticket, the 2021 Rainfall (RI) Policy for PRF (008), API (1191), and Annual Forage (0332) has been implemented in the System. Additionally, the 2021 Provisions for PRF and API have been implemented in the System. Provisions print with the MPCI Policy Declaration Page when the print option to print provisions with the form is selected. The MPCI Policy Declaration Page is available to print from the MPCI policy Print tab and from the Batch Printing menu. |
120228 |
||||||||||||
SPOI: Florida (FL) Citrus Fruit 2022 Special Provisions were updated and made available from RMA on August 31, 2020. These Special Provisions for 2022 have been downloaded and implemented in the System. |
120409 |
||||||||||||
MPCI App: An issue was found where, on the main MPCI Application, the Crop Year in the page 2+ header was not printing with the +1 when the pre-print for next year print option was selected. This issue has been resolved for all Crop Years. |
120728 |
||||||||||||
SOI: On the Schedule of Insurance (SOI), an issue was found where data was printing for coverages with zero acres in the MP Premium Reduction Section. With this ticket, the SOI has been updated to print premium information correctly in the MP Premium Reduction Section. This update applies for all years. |
120468 |
||||||||||||
SPOI: PRF (0088), API (1191), and Pistachios (0470) 2021 Special Provisions were updated and made available from RMA on August 27, 2020. These Special Provisions for 2021 have been downloaded and implemented in the System. |
120274 |
||||||||||||
SOI: The Schedule of Insurance (SOI) for Nursery Value Select (NVS) has been updated in the following ways for all years:
|
120609 |
Global
DESCRIPTION | ID # |
---|---|
The Online Help Site was updated with topics as well as with current release notes. |
118647 |
Mapping
DESCRIPTION | ID # |
---|---|
Users requested the addition of an ESRI Hybrid layer with road labels; this has been implemented and the ESRI Hybrid layer is now an option on the Layers panel. When printing a map book from within the Mapping Module and this layer is active, then the layer's details print on the map book. |
111895 |
For PRF fields, a data extract of PRF information is now available via Tools > Export Fields in the Mapping Module. This is only available to users who have the proper permissions. |
120247 |
Users requested to have the option to shade by unit group when printing a PRF Mapbook. Now, users can select "Unit Group" from the Shade By dropdown in the PRF Map Book print tab. |
120164 |
A new mapping layer for September 2020 was released by the RMA and has been implemented in the System. |
120952 |
It was found while testing that when using the Sync from AR function to load PRF fields, the System was not setting the Grid ID on the planting records. Then, when the PRF Wizard was used, the System was creating a duplicate planting record that had the Grid ID, which caused acres too appear doubled. This has been corrected. |
121040 |
Users requested that, when drawing a polygon map region, that the selection area be made transparent to be able to identify the fields being included in the map region. This has been implemented. |
118363 |
MPCI
DESCRIPTION | ID # | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
HIP: RMA issued a new GAP option for HIP that will be applicable for the 2020 RY only. The Gap, or "HE", option allows producers of certain crops, where the end of insurance period is before the end of the hurricane season and prior to the beginning of the insurance period for the next crop year, to purchase coverage for the time period coverage gap between the end of insurance period and the beginning of the new crop year's insurance period. TFS #118537 in the 9.030 release implemented functionality to elect this option on the coverage, but at that time RMA had not released the premium calculation. This ticket implemented the rating logic for the new GAP option. |
119654 |
||||||||||||||||||||||||||||||||||||||||||
Production Reporting Lockouts: Functionality was originally stood up with TFS #54399 for the PRD Lockout logic as it relates to Added Land/New Crop P/T. An exception to the PRD lockout logic was put in place around Added Land and New Crop P/T since APHs for these procedures would be added during ARD and well after the PRD lockout. The exception allows for a new APH to be created by an agency user after the PRD lockout date but only if the following criteria exist:
The last criterion was the piece the AIP had found issues with. Agency users were creating a new APH by performing a preliminary save and then attempting to perform a standard save after that. Once the preliminary save was performed, the System saved the APH record to the database and viewed the APH as existing rather than a new APH. Therefore, when the user subsequently performs a standard save to calculate the APH (since only a preliminary save was previously performed, the APH does not get calculated), they received the lockout error since #3 was no longer met. The System logic was updated so an agency user can create a new APH after the PRD lockout date—BUT ONLY if the following criteria exist:
|
119000 |
||||||||||||||||||||||||||||||||||||||||||
MCEU: As part of the 2021 MCEU changes, RMA updated procedures to allow additional options for assigning unit structure when the coverage(s) do not qualify for the original election on the ARD, including additional forms of MCEU. This specifically affects when MC is elected with EP on both Irrigation Practices. In this scenario if the coverages do not qualify for MC with EP on both Irrigation Practices and the coverage also does not qualify for EP on both practices without MC, then the following MCEU options are available when assigning unit structure on the ARD:
These options are in addition to several non-MCEU unit structure assignments. TFS #116578 in the 9.035 release implemented new override options to allow the AIP to assign unit structure on the ARD based on the 2021 procedures. Prior to 2021, in order to qualify for MCEU, the coverage(s) had to qualify using the original unit structure election; otherwise, the grower was not eligible for MCEU. Given that MCEU can now be applied using a different unit structure election than what was elected on the coverage, the System's rating logic needed to be updated. Part of the System's rating logic for MCEU determines the total number of acres in each MCEU for use in the premium calculation. In 2020 and prior years, the System used the unit structure election on the coverage to determine which detail lines belonged in which enterprise units when the MC unit structure was applied to the detail lines. For example, if MC + EU is elected, then all detail lines for both coverages are in one enterprise unit, but if MC + EP Both is elected, then all irrigated lines for both coverages would be one enterprise unit and all non-irrigated lines for both coverages would be a separate enterprise unit. However, now that different forms of MCEU can be applied via an override, this logic must first determine if an MCEU override applies, and if so, use the selected override to determine which detail lines make up which enterprise unit. Otherwise, the logic that uses the election on the coverage will continue to apply. With this ticket the rating logic for MCEU, which determines the total number of acres in each enterprise unit, has been updated to first determine if an MCEU override applies. If so, the System will use that override to determine which detail lines/acres make up each enterprise unit. If an MCEU override is not applied and MC unit structure exists on the detail line, then the System will use the unit structure election on the coverage to determine which detail lines/acres make up each enterprise unit. Each override and coverage election scenario is outlined below.
|
118857 |
||||||||||||||||||||||||||||||||||||||||||
Quality Loss Option: A new Qualifies for QL flag of "Q" was added to the Production History tab of the APH to indicate when a crop year in the APH qualifies for the Quality Loss Option.
|
119398 |
||||||||||||||||||||||||||||||||||||||||||
Quality Loss Option: It was determined that some adjustments were needed to the original functionality from TFS #108176 that implemented support of the new Quality Loss Option (QLO) in the 9.015 release. These changes were needed to support the ability to designate Crop Years that might qualify for QLO (implemented with TFS #119398 in the 9.040 release). For the 2021+ RY, any time a Pre Quality Production and/or Yield value is applied to a CY, the Qualifies for QL flag (new with TFS #119398) will be set for that CY. This flag will only be used to indicate that the CY qualifies for QLO because Pre-Quality information is available. It does not mean QLO is actually applied to a given CY(s). Only the QL checkbox indicates QLO is actually applied to a CY(s). This is the flag that displays in the APH Utilities grid of the APH database. Once set, the only time the new QL flag can be removed for a given CY is if the Pre-Quality Prod and Pre-Quality Yield values are both removed for that CY. This determination will happen upon save of the APH database. If the flag is removed for any reason (by accidentally removing Production and Yield info or deleting a premium line for instance), the System will not be able to restore these values. The user will be required to manually restore the flag by rekeying the Pre-Quality Production and Pre-Quality Yield. This, in turn, will reapply the Qualifies for QL flag. The following adjustments were also made with this ticket:
NOTE: If a user keys a Pre-Quality Yield value without a Pre-Quality Prod value, at save of the APH, the System will throw the following validation, which already exist with the original functionality from TFS #108176 (hard edit): "Pre-Quality Production is required when Pre-Quality Yield is entered."
|
120199 |